Roadworks in Manchester City Council
Live and upcoming roadworks, closures and disruption across Manchester City Council, from Department for Transport Street Manager data. Updated 9 June 2026.
-
Store Street
(91428) ===Situation===
Front
===Location on the highway===
Pavement and road
===Purpose of structur — STORE STREET · 2025-06-01T00:00:00.000Z → 2026-07-16T23:59:00.000Z
Minor
-
Parkville Road
New service connection — PARKVILLE ROAD · 2025-06-02 → 2026-06-29
Medium
-
Ludgate Hill
(89616) ===Situation===
Front
===Location on the highway===
Pavement
===Purpose of structure===
Buil — LUDGATE HILL · 2025-07-21T00:00:00.000Z → 2026-10-31T23:59:00.000Z
Minor
-
St John Street
(91290) Applications approved by Taylor and Ben at HNM.
===Situation===
Rear
===Location on the high — ST JOHN STREET · 2025-11-26T00:00:00.000Z → 2026-07-06T23:59:00.000Z
Minor
-
Longworth Street
(90678) Approved by Taylor and Ben at HNM.
===Situation===
Front
===Location on the highway===
Pavem — LONGWORTH STREET · 2025-11-26T00:00:00.000Z → 2026-07-07T23:59:00.000Z
Minor
-
Store Street
(91433) ===Situation===
Side
===Location on the highway===
Pavement
===Purpose of structure===
Build — STORE STREET · 2025-12-01T00:00:00.000Z → 2026-07-17T23:59:00.000Z
Minor
-
Old Bank Street
(91481) Agreed by Taylor.
All tubes at base of gantry scaffold will be covered in protective foam, a — OLD BANK STREET · 2025-12-08T00:00:00.000Z → 2026-06-30T23:59:00.000Z
Minor
-
Deansgate
(91589) ===Situation===
Front
===Location on the highway===
Pavement
===Purpose of structure===
Buil — DEANSGATE · 2026-01-05T00:00:00.000Z → 2026-07-06T23:59:00.000Z
Minor
-
Corporation Street
Utility asset works — CORPORATION STREET · 2026-02-02 → 2026-08-13
Medium
-
Fairfield Street
Utility asset works — FAIRFIELD STREET · 2026-02-09 → 2026-06-13
Medium
-
Bank Street
(93409) ===Situation===
Front
===Location on the highway===
Pavement
===Purpose of structure===
Gene — BANK STREET · 2026-02-26T00:00:00.000Z → 2026-06-21T23:59:00.000Z
Minor
-
Pocklington Drive
(91958) ===Situation===
Rear
===Location on the highway===
Pavement and road
===Purpose of structure — POCKLINGTON DRIVE · 2026-03-09T00:00:00.000Z → 2027-04-02T23:59:00.000Z
Minor
-
Corporation Street
(94254) Location on the highway - Front of Arches in carriageway
Purpose of structure - Access to — CORPORATION STREET · 2026-03-29T23:00:00.000Z → 2026-11-26T23:59:00.000Z
Minor
-
Arundel Street
(94325) ===Situation===
Front
===Location on the highway===
Pavement
===Purpose of structure===
Gene — ARUNDEL STREET · 2026-04-05T23:00:00.000Z → 2027-04-05T22:59:00.000Z
Minor
-
Beswick Row
(94613) ===Situation===
Front
===Location on the highway===
Pavement
===Purpose of structure===
Buil — BESWICK ROW · 2026-04-20T23:00:00.000Z → 2026-07-30T22:59:00.000Z
Minor
-
Jersey Street
Highway improvement works — JERSEY STREET · 2026-04-21 → 2026-06-30
High
-
Jersey Street
Highway improvement works — JERSEY STREET · 2026-04-21 → 2026-06-30
High
-
Jersey Street
Highway improvement works — JERSEY STREET · 2026-04-21 → 2026-06-30
High
-
Upper Brook Street
(94381) ===Situation===
Front + Rear of 53 Upper Brook Street
===Location on the highway===
Pavement — UPPER BROOK STREET · 2026-04-28T23:00:00.000Z → 2027-04-28T22:59:00.000Z
Minor
-
Great Southern Street
(94501) ===Situation===
Side
===Location on the highway===
Pavement and road
===Purpose of structure — GREAT SOUTHERN STREET · 2026-04-30T23:00:00.000Z → 2027-04-30T22:59:00.000Z
Minor
-
Brideoak Street
Utility asset works — BRIDEOAK STREET · 2026-05-04 → 2026-06-09
Medium
-
Port Street
Highway improvement works — PORT STREET · 2026-05-06 → 2026-06-24
Medium
-
Great Jackson Street
Highway improvement works — GREAT JACKSON STREET · 2026-05-06 → 2026-11-04
Medium
-
Burnage Lane
(94490) ===Situation===
Front
===Location on the highway===
Pavement
===Purpose of structure===
Gene — BURNAGE LANE · 2026-05-07T23:00:00.000Z → 2026-07-02T22:59:00.000Z
Minor
-
Manchester Road
(94328) Situation - Along the footpath , Manchester road.
Purpose of structure - To allow construct — MANCHESTER ROAD · 2026-05-10T23:00:00.000Z → 2026-08-02T22:59:00.000Z
Minor
-
Boland Drive
Highway improvement works — BOLAND DRIVE · 2026-05-11 → 2026-12-31
Minor
-
Sherwood Street
Highway improvement works — SHERWOOD STREET · 2026-05-11 → 2026-12-31
Minor
-
Wilmslow Road
Highway improvement works — WILMSLOW ROAD · 2026-05-11 → 2026-12-31
High
-
Lathbury Road
Highway improvement works — LATHBURY ROAD · 2026-05-11 → 2026-06-21
Medium
-
Ladybarn Road
Highway improvement works — LADYBARN ROAD · 2026-05-11 → 2026-12-31
Minor
-
Carisbrook Street
Highway improvement works — CARISBROOK STREET · 2026-05-11 → 2026-06-21
Medium
-
George Street
(94794) Situation - George Street, to the width of Manchester Art Gallery Loading Bay, Encroaching — GEORGE STREET · 2026-05-13T23:00:00.000Z → 2026-07-15T22:59:59.000Z
Minor
-
Halliwell Lane
(94651) ===Situation===
Front
===Location on the highway===
Pavement
===Purpose of structure===
Gene — HALLIWELL LANE · 2026-05-14T23:00:00.000Z → 2026-06-11T22:59:00.000Z
Minor
-
Bridgewater Viaduct
(94495) ===Situation===
Side
===Location on the highway===
Pavement and road
===Purpose of structure — BRIDGEWATER VIADUCT · 2026-05-15T23:00:00.000Z → 2026-06-12T22:59:00.000Z
Minor
-
King Street
(94789) No extensions can be given due to The Flower Show from 20th May 2026
===Situation===
Front
= — KING STREET · 2026-05-16T23:00:00.000Z → 2026-06-13T22:59:00.000Z
Minor
-
Bronte Street
Remedial works — BRONTE STREET · 2026-05-17 → 2026-06-14
High
-
Aquarius Street
Remedial works — AQUARIUS STREET · 2026-05-17 → 2026-06-14
High
-
Eyre Street
Remedial works — EYRE STREET · 2026-05-17 → 2026-06-14
High
-
Claude Road
Utility repair and maintenance works — CLAUDE ROAD · 2026-05-17 → 2026-07-14
Medium
-
Waterloo Road
Utility asset works — WATERLOO ROAD · 2026-05-17 → 2026-06-14
Medium
-
Plymouth Grove
Utility asset works — PLYMOUTH GROVE · 2026-05-17 → 2026-06-28
Medium
-
St James'S Square
(94802) A maximum of 5 meter wide scaffolding will be erected all the way to the main roof of the bu — ST JAMES'S SQUARE · 2026-05-17T23:00:00.000Z → 2026-06-14T22:59:00.000Z
Minor
-
Bankfield Avenue
(94790) ===Situation===
Front
===Location on the highway===
Pavement
===Purpose of structure===
Gene — BANKFIELD AVENUE · 2026-05-17T23:00:00.000Z → 2026-06-14T22:59:00.000Z
Minor
-
Tariff Street
(94760) ===Situation===
Front
===Location on the highway===
Pavement
===Purpose of structure===
Gene — TARIFF STREET · 2026-05-17T23:00:00.000Z → 2026-06-14T22:59:00.000Z
Minor
-
Store Street
(94751) Temporary creation of vehicle access point/crossover to facilitate construction access into — STORE STREET · 2026-05-17T23:00:00.000Z → 2027-12-31T23:59:59.000Z
Minor
-
York Street
(94967) ===Situation===
Side
===Location on the highway===
Road
===Purpose of structure===
Building — YORK STREET · 2026-05-17T23:00:00.000Z → 2026-10-26T23:59:00.000Z
Minor
-
Claude Road
Utility repair and maintenance works — CLAUDE ROAD · 2026-05-17T23:00:00.000Z → 2026-07-14T23:00:00.000Z
Medium
-
Boland Drive
Highway improvement works — BOLAND DRIVE · 2026-05-18 → 2027-01-25
Medium
-
Crescent Road
Utility asset works — CRESCENT ROAD · 2026-05-18 → 2026-06-22
Medium
-
Heywood Street
Utility asset works — HEYWOOD STREET · 2026-05-18 → 2026-06-09
Medium
-
Midville Road
Utility asset works — MIDVILLE ROAD · 2026-05-18 → 2026-06-21
Medium
-
Wilmslow Road
Highway improvement works — WILMSLOW ROAD · 2026-05-18 → 2027-01-25
Medium
-
Sherwood Street
Highway improvement works — SHERWOOD STREET · 2026-05-18 → 2027-01-25
High
-
River Street
Highway improvement works — RIVER STREET · 2026-05-18 → 2026-06-14
Medium
-
Ladybarn Road
Highway improvement works — LADYBARN ROAD · 2026-05-18 → 2027-01-25
Medium
-
Pocklington Drive
(94563) ===Situation===
Rear
===Location on the highway===
Pavement
===Purpose of structure===
Build — POCKLINGTON DRIVE · 2026-05-18T00:00:00.000Z → 2027-01-08T23:59:00.000Z
Minor
-
Bailey Lane
Section 58 restriction: BAILEY LANE · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Brantwood Terrace
Section 58 restriction: BRANTWOOD TERRACE · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
School Grove
Section 58 restriction: SCHOOL GROVE · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Sharp Street
Section 58 restriction: SHARP STREET · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Brunswick Street
Section 58 restriction: BRUNSWICK STREET · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Mason Street
Section 58 restriction: MASON STREET · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Wembley Road
Section 58 restriction: WEMBLEY ROAD · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Stockport Road
Section 58 restriction: STOCKPORT ROAD · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Oldham Road
Section 58 restriction: OLDHAM ROAD · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Marshall Street
Section 58 restriction: MARSHALL STREET · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Thompson Street
Section 58 restriction: THOMPSON STREET · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Polygon Street
Section 58 restriction: POLYGON STREET · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Oakdene Street
Section 58 restriction: OAKDENE STREET · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Sharp Street
Section 58 restriction: SHARP STREET · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Saltdene Road
Section 58 restriction: SALTDENE ROAD · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Ludgate Hill
Section 58 restriction: LUDGATE HILL · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Moston Lane
Section 58 restriction: MOSTON LANE · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Honister Road
Section 58 restriction: HONISTER ROAD · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Cross Keys Street
Section 58 restriction: CROSS KEYS STREET · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Hibbert Street
Section 58 restriction: HIBBERT STREET · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Hesford Avenue
Section 58 restriction: HESFORD AVENUE · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Broadway
Section 58 restriction: BROADWAY · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Hilary Road
Section 58 restriction: HILARY ROAD · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Fernclough Road
Section 58 restriction: FERNCLOUGH ROAD · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Sharp Street
Section 58 restriction: SHARP STREET · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Cassidy Close
Section 58 restriction: CASSIDY CLOSE · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Waverley Road West
Section 58 restriction: WAVERLEY ROAD WEST · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Cornell Street
Section 58 restriction: CORNELL STREET · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Mora Street
Section 58 restriction: MORA STREET · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Bendix Street
Section 58 restriction: BENDIX STREET · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Grandale Street
Section 58 restriction: GRANDALE STREET · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Bordale Avenue
Section 58 restriction: BORDALE AVENUE · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Moston Lane East
Section 58 restriction: MOSTON LANE EAST · 2026-05-18T23:00:00.000Z → 2028-05-17T23:00:00.000Z
High
-
Claude Road
Utility repair and maintenance works — CLAUDE ROAD · 2026-05-19 → 2026-08-25
Medium
-
Whitley Road
(95090) Location on the highway Footpath
Purpose of structure Allow scaffold to sit on footpath
Type — WHITLEY ROAD · 2026-05-19T23:00:00.000Z → 2026-10-19T22:59:00.000Z
Minor
-
Dantzic Street
(95096) Dantzic St 25m x 1m Gould St 10m x 1m
Situation
Location on the highway Road
Purpose of stru — DANTZIC STREET · 2026-05-19T23:00:00.000Z → 2026-07-19T22:59:00.000Z
Minor
-
Radium Street
(94959) ===Situation===
Front
===Location on the highway===
Pavement
===Purpose of structure===
Gene — RADIUM STREET · 2026-05-19T23:00:00.000Z → 2026-09-08T22:59:00.000Z
Minor
-
Kincardine Road
Highway repair and maintenance works — KINCARDINE ROAD · 2026-05-20 → 2026-06-17
High
-
Princess Road
Highway repair and maintenance works — PRINCESS ROAD · 2026-05-21 → 2026-06-21
High
-
Woodward Street
(95048) ===Situation===
Front
===Location on the highway===
Pavement
===Purpose of structure===
Gene — WOODWARD STREET · 2026-05-21T23:00:00.000Z → 2026-06-18T22:59:00.000Z
Minor
-
Crumpsall Lane
Utility asset works — CRUMPSALL LANE · 2026-05-22 → 2026-07-12
Medium
-
Willow Hill Road Icw Crumpsall Lane
Utility asset works — WILLOW HILL ROAD ICW CRUMPSALL LANE · 2026-05-22 → 2026-06-09
Minor
-
Simeon Street
(91485) Situation Half road closure, taking up parking bays.
Location on the highway - Pavement and — SIMEON STREET · 2026-05-22T00:00:00.000Z → 2027-02-08T23:59:00.000Z
Minor
-
Simeon Street
(91486) Situation Half road closure, taking up parking bays.
Location on the highway - Pavement and — SIMEON STREET · 2026-05-22T00:00:00.000Z → 2027-02-08T23:59:00.000Z
Minor
-
Simeon Street
(91484) Situation Half road closure, taking up parking bays.
Location on the highway - Pavement and — SIMEON STREET · 2026-05-22T00:00:00.000Z → 2027-02-08T23:59:00.000Z
Minor
-
Simeon Street
(91487) Situation Half road closure, taking up parking bays.
Location on the highway - Pavement and — SIMEON STREET · 2026-05-22T14:38:00.000Z → 2027-02-08T23:59:00.000Z
Minor
-
Newmill Walk
Utility asset works — NEWMILL WALK · 2026-05-24 → 2026-06-21
Medium
-
Alderford Parade
Utility asset works — ALDERFORD PARADE · 2026-05-24 → 2026-06-21
Medium
-
Kerne Grove
Utility repair and maintenance works — KERNE GROVE · 2026-05-24 → 2026-06-09
Minor
-
Wilmslow Road
(94668) ===Situation===
Front
===Location on the highway===
Pavement
===Purpose of structure===
Buil — WILMSLOW ROAD · 2026-05-24T23:00:00.000Z → 2026-07-08T22:59:00.000Z
Minor
-
Charles Halle Road
Utility asset works — CHARLES HALLE ROAD · 2026-05-24T23:00:00.000Z → 2026-06-14T23:00:00.000Z
Medium
-
Greenheys Lane
Utility asset works — GREENHEYS LANE · 2026-05-24T23:00:00.000Z → 2026-06-14T23:00:00.000Z
Medium
-
Gartland Walk
Utility asset works — GARTLAND WALK · 2026-05-24T23:00:00.000Z → 2026-06-14T23:00:00.000Z
Medium
-
Faulkner Street
(94874) ===Situation===
Front
===Location on the highway===
Pavement
===Purpose of structure===
Gene — FAULKNER STREET · 2026-05-25T23:00:00.000Z → 2026-07-14T22:59:00.000Z
Minor
-
King Street
(94973) ===Situation===
Front
===Location on the highway===
Pavement
===Purpose of structure===
Gene — KING STREET · 2026-05-25T23:00:00.000Z → 2026-06-22T22:59:00.000Z
Minor
-
Stenner Lane
New service connection — STENNER LANE · 2026-05-26 → 2026-06-15
Medium
-
Wilmslow Road
New service connection — WILMSLOW ROAD · 2026-05-26 → 2026-06-15
Medium
-
Chichester Road
Utility repair and maintenance works — CHICHESTER ROAD · 2026-05-26 → 2026-06-16
Medium
-
Chichester Road
Utility repair and maintenance works — CHICHESTER ROAD · 2026-05-26 → 2026-06-16
Medium
-
Oxton Street
Utility asset works — OXTON STREET · 2026-05-27 → 2026-06-09
Minor
-
Neston Street
Utility asset works — NESTON STREET · 2026-05-27 → 2026-06-09
Minor
-
Cottesmore Drive
Utility asset works — COTTESMORE DRIVE · 2026-05-27 → 2026-06-09
Minor
-
Montana Square
Utility asset works — MONTANA SQUARE · 2026-05-27 → 2026-06-09
Minor
-
Burman Street
Utility asset works — BURMAN STREET · 2026-05-27 → 2026-06-09
Minor
-
Woodbridge Grove
Utility repair and maintenance works — WOODBRIDGE GROVE · 2026-05-27 → 2026-06-09
Minor
-
Burstead Street
Utility asset works — BURSTEAD STREET · 2026-05-28 → 2026-06-10
Minor
-
Kenyon Lane
(95051) ===Situation===
Front
===Location on the highway===
Pavement
===Purpose of structure===
Buil — KENYON LANE · 2026-05-28T23:00:00.000Z → 2026-06-25T22:59:00.000Z
Minor
-
Smedley Road
Utility repair and maintenance works — SMEDLEY ROAD · 2026-05-29 → 2026-06-11
High
-
Lassell Street
Utility asset works — LASSELL STREET · 2026-05-29 → 2026-06-11
Minor
-
Midville Road
Utility asset works — MIDVILLE ROAD · 2026-05-30 → 2026-06-13
Minor
-
Old Church Street
(90338) Electric LV main installation for ENWL to adopt
TM to be stop & go, switched half way throu — OLD CHURCH STREET · 2026-05-30T00:00:00.000Z → 2026-06-12T23:59:00.000Z
Minor
-
Northmoor Road
Utility repair and maintenance works — NORTHMOOR ROAD · 2026-05-31 → 2026-06-21
Medium
-
Hermitage Road Icw Crumpsall Lane
Utility asset works — HERMITAGE ROAD ICW CRUMPSALL LANE · 2026-05-31 → 2026-06-14
Medium
-
Craig Road
Utility repair and maintenance works — CRAIG ROAD · 2026-05-31 → 2026-06-15
Medium
-
Station Road
Utility asset works — STATION ROAD · 2026-05-31 → 2026-06-21
Medium
-
John Heywood Street Icw Vale Street
Utility asset works — JOHN HEYWOOD STREET ICW VALE STREET · 2026-05-31 → 2026-06-11
Minor
-
Bradwen Avenue
Utility asset works — BRADWEN AVENUE · 2026-05-31 → 2026-06-11
Minor
-
Orton Road
Utility repair and maintenance works — ORTON ROAD · 2026-05-31 → 2026-06-11
Minor
-
King Street
New service connection — KING STREET · 2026-05-31 → 2026-06-13
Minor
-
Footpath Side 8 Ronton Walk
Utility asset works — FOOTPATH SIDE 8 RONTON WALK · 2026-05-31 → 2026-06-11
Minor
-
Craig Road
Utility repair and maintenance works — CRAIG ROAD · 2026-05-31 → 2026-06-15
Medium
-
Nunthorpe Drive Icw Crescent Road
Utility asset works — NUNTHORPE DRIVE ICW Crescent Road · 2026-05-31 → 2026-06-11
Minor
-
Bilton Walk
Utility asset works — BILTON WALK · 2026-05-31 → 2026-06-11
Minor
-
Milk Street
Utility repair and maintenance works — MILK STREET · 2026-05-31 → 2026-06-25
High
-
Stakeford Drive
Utility asset works — STAKEFORD DRIVE · 2026-05-31 → 2026-06-11
Minor
-
Hermitage Road Icw Crumpsall Lane
Utility asset works — HERMITAGE ROAD ICW CRUMPSALL LANE · 2026-05-31 → 2026-06-14
High
-
Lanesfield Walk
Utility asset works — LANESFIELD WALK · 2026-05-31 → 2026-06-14
Medium
-
Hazelbottom Road
Utility asset works — HAZELBOTTOM ROAD · 2026-05-31 → 2026-06-11
Minor
-
Dryden Street
(95141) ===Situation===
Front
===Location on the highway===
Pavement
===Purpose of structure===
Buil — DRYDEN STREET · 2026-05-31T23:00:00.000Z → 2027-05-31T22:59:00.000Z
Minor
-
Northmoor Road
Utility repair and maintenance works — NORTHMOOR ROAD · 2026-05-31T23:00:00.000Z → 2026-06-21T23:00:00.000Z
Medium
-
Footpath 12 To 18 Foynes Close
Utility asset works — FOOTPATH 12 TO 18 FOYNES CLOSE · 2026-05-31T23:00:00.000Z → 2026-06-13T23:00:00.000Z
Medium
-
Charles Street
(94797) One Way Road Closure to be installed during the works. TM plan and TTRO agreement attached. — CHARLES STREET · 2026-05-31T23:00:00.000Z → 2026-09-07T22:59:00.000Z
Minor
-
Bank Street
(95011) ===Situation===
Front
===Location on the highway===
Pavement
===Purpose of structure===
Gene — BANK STREET · 2026-05-31T23:00:00.000Z → 2026-06-28T22:59:00.000Z
Minor
-
Ashton Old Road
Utility repair and maintenance works — ASHTON OLD ROAD · 2026-05-31T23:00:00.000Z → 2026-06-11T23:00:00.000Z
High
-
Chatham Street
(94955) ===Situation===
Front
===Location on the highway===
Pavement
===Purpose of structure===
Gene — CHATHAM STREET · 2026-05-31T23:00:00.000Z → 2026-06-21T22:59:00.000Z
Minor
-
Milk Street
Highway repair and maintenance works — MILK STREET · 2026-05-31T23:00:00.000Z → 2026-06-25T23:00:00.000Z
High
-
Great Jackson Street
Highway improvement works — GREAT JACKSON STREET · 2026-06-01 → 2026-07-03
Medium
-
Heys Avenue
Utility repair and maintenance works — HEYS AVENUE · 2026-06-01 → 2026-06-14
Minor
-
Swalecliff Avenue
Highway repair and maintenance works — SWALECLIFF AVENUE · 2026-06-01 → 2026-06-12
Minor
-
Rosina Street
Utility asset works — ROSINA STREET · 2026-06-01 → 2026-06-12
Minor
-
Kingslea Road
Highway repair and maintenance works — KINGSLEA ROAD · 2026-06-01 → 2026-06-12
Minor
-
Lapwing Lane
Highway repair and maintenance works — LAPWING LANE · 2026-06-01 → 2026-06-12
Minor
-
Portland Street
(94876) ===Situation===
Front
===Location on the highway===
Pavement
===Purpose of structure===
Gene — PORTLAND STREET · 2026-06-01T00:00:00.000Z → 2026-06-14T23:59:00.000Z
Minor
-
Torbay Road
Utility repair and maintenance works — TORBAY ROAD · 2026-06-01T07:15:00.000Z → 2026-06-09T23:00:00.000Z
High
-
Higher Ardwick
Utility repair and maintenance works — HIGHER ARDWICK · 2026-06-01T23:00:00.000Z → 2026-06-14T23:00:00.000Z
High
-
Grey Street
Utility repair and maintenance works — GREY STREET · 2026-06-01T23:00:00.000Z → 2026-06-14T23:00:00.000Z
High
-
Atherton Street
New service connection — ATHERTON STREET · 2026-06-02 → 2026-06-15
High
-
Young Street
New service connection — YOUNG STREET · 2026-06-02 → 2026-06-15
High
-
Hazelbottom Road Icw Chataway Road
Utility asset works — HAZELBOTTOM ROAD ICW CHATAWAY ROAD · 2026-06-02 → 2026-06-15
Medium
-
Vine Street
Utility asset works — VINE STREET · 2026-06-02 → 2026-06-15
Minor
-
Delamere Street
Utility asset works — DELAMERE STREET · 2026-06-02 → 2026-06-15
Minor
-
Alderfield Road
New service connection — ALDERFIELD ROAD · 2026-06-02 → 2026-06-10
Minor
-
Burleigh Street
(95235) Medium skip – 8 cubic yards (70 bags of waste) — BURLEIGH STREET · 2026-06-02T23:00:00.000Z → 2026-06-09T22:59:00.000Z
Minor
-
Wilmslow Road
(95137) ===Situation===
Side
===Location on the highway===
Pavement
===Purpose of structure===
Gener — WILMSLOW ROAD · 2026-06-02T23:00:00.000Z → 2026-06-30T22:59:00.000Z
Minor
-
Lidgate Grove
(95192) Midi skip – 4 to 6 cubic yards (35-55 bags of waste) — LIDGATE GROVE · 2026-06-02T23:00:00.000Z → 2026-06-09T22:59:00.000Z
Minor
-
Green Drive
(95019) Medium skip – 8 cubic yards (70 bags of waste) — GREEN DRIVE · 2026-06-02T23:00:00.000Z → 2026-06-09T22:59:00.000Z
Minor
-
Byrom Street
(95022) ===Situation===
Side
===Location on the highway===
Pavement
===Purpose of structure===
Build — BYROM STREET · 2026-06-02T23:00:00.000Z → 2026-06-30T22:59:00.000Z
Minor
-
Enterprise Way
(95213) ===Situation===
Front
===Location on the highway===
Pavement and road
===Purpose of structur — ENTERPRISE WAY · 2026-06-02T23:00:00.000Z → 2026-06-09T22:59:00.000Z
Minor
-
Laystall Street
(94786) ===Situation===
Side
===Location on the highway===
Pavement and road
===Purpose of structure — LAYSTALL STREET · 2026-06-02T23:00:00.000Z → 2027-06-02T22:59:00.000Z
Minor
-
Beverley Street
(95214) Medium skip – 8 cubic yards (70 bags of waste) — BEVERLEY STREET · 2026-06-02T23:00:00.000Z → 2026-06-09T22:59:00.000Z
Minor
-
Allanson Road
(95173) Medium skip – 8 cubic yards (70 bags of waste) — ALLANSON ROAD · 2026-06-02T23:00:00.000Z → 2026-06-09T22:59:00.000Z
Minor
-
Granville Road
(95196) Medium skip – 8 cubic yards (70 bags of waste) — GRANVILLE ROAD · 2026-06-02T23:00:00.000Z → 2026-06-09T22:59:00.000Z
Minor
-
Crescent Road
Utility repair and maintenance works — CRESCENT ROAD · 2026-06-02T23:00:00.000Z → 2026-06-15T23:00:00.000Z
High
-
Hyde Road
Utility repair and maintenance works — HYDE ROAD · 2026-06-02T23:00:00.000Z → 2026-06-15T23:00:00.000Z
High
-
Thornton Road
(95140) Midi skip – 4 to 6 cubic yards (35-55 bags of waste) — THORNTON ROAD · 2026-06-02T23:00:00.000Z → 2026-06-09T22:59:00.000Z
Minor
-
Burnage Lane
Utility repair and maintenance works — BURNAGE LANE · 2026-06-03 → 2026-06-09
Minor
-
Crawley Avenue
New service connection — CRAWLEY AVENUE · 2026-06-03 → 2026-06-09
Minor
-
Nisbet Avenue
New service connection — NISBET AVENUE · 2026-06-03 → 2026-06-09
Minor
-
Jetson Street
Utility asset works — JETSON STREET · 2026-06-03 → 2026-06-16
Minor
-
Devonshire Street
Disconnection or alteration of supply — DEVONSHIRE STREET · 2026-06-03 → 2026-06-09
Minor
-
Frimley Gardens
New service connection — FRIMLEY GARDENS · 2026-06-03 → 2026-06-09
Minor
-
Prestage Street
(95224) Medium skip – 8 cubic yards (70 bags of waste) — PRESTAGE STREET · 2026-06-03T07:47:04.774Z → 2026-06-09T22:59:00.000Z
Minor
-
Ferndene Road
Utility repair and maintenance works — FERNDENE ROAD · 2026-06-03T23:00:00.000Z → 2026-06-09T23:00:00.000Z
High
-
Ash Tree Road
(95335) Medium skip – 8 cubic yards (70 bags of waste) — ASH TREE ROAD · 2026-06-03T23:00:00.000Z → 2026-06-10T22:59:00.000Z
Minor
-
Prestage Street
(95212) ===Situation===
Front
===Location on the highway===
Pavement
===Purpose of structure===
Gene — PRESTAGE STREET · 2026-06-03T23:00:00.000Z → 2026-06-24T22:59:00.000Z
Minor
-
Barlow Moor Road
Utility repair and maintenance works — BARLOW MOOR ROAD · 2026-06-03T23:00:00.000Z → 2026-06-09T23:00:00.000Z
High
-
Deramore Street
(95234) Medium skip – 8 cubic yards (70 bags of waste) — DERAMORE STREET · 2026-06-03T23:00:00.000Z → 2026-06-10T22:59:00.000Z
Minor
-
St Georges Road
(95175) Mini skip – 2 cubic yards (30 bags of waste) — ST GEORGES ROAD · 2026-06-03T23:00:00.000Z → 2026-06-10T22:59:00.000Z
Minor
-
Greenwood Road
(95147) Medium skip – 8 cubic yards (70 bags of waste) — GREENWOOD ROAD · 2026-06-03T23:00:00.000Z → 2026-06-10T22:59:00.000Z
Minor
-
Frimley Gardens
New service connection — FRIMLEY GARDENS · 2026-06-03T23:00:00.000Z → 2026-06-09T23:00:00.000Z
Minor
-
Barlow Moor Road
(95193) ===Situation===
Side
===Location on the highway===
Pavement
===Purpose of structure===
Gener — BARLOW MOOR ROAD · 2026-06-03T23:00:00.000Z → 2026-06-17T22:59:00.000Z
Minor
-
Sackville Street
Disconnection or alteration of supply — SACKVILLE STREET · 2026-06-04 → 2026-06-09
Minor
-
Great Marlborough Street
New service connection — GREAT MARLBOROUGH STREET · 2026-06-04 → 2026-06-10
Minor
-
Handsworth Street
Utility repair and maintenance works — HANDSWORTH STREET · 2026-06-04T02:50:00.000Z → 2026-06-09T23:00:00.000Z
High